Equipment scope

Double tee moulds form the flange and two ribs of the slab. The mould layout follows the approved element geometry, end details, reinforcement and the chosen production method.

  • Flange and rib geometry
  • End forms, openings and embedded features
  • Prestressing and casting-bed interfaces
  • Demoulding access and lifting clearances

Configuration inputs

  • Approved slab and reinforcement drawings
  • Length range and prestressing arrangement
  • Casting-bed layout and required production cycle

Equipment limits, utilities, controls and acceptance requirements are confirmed in the project technical package.

Related production solution

View the production process.

Realjet headquarters, manufacturing workshop and company honor display