Factory heavy-load transport
Heavy Load Handling Solutions

Compare platforms, routes and automation for your load.

Find a Transfer Cart

Specifications

KPX Rail Transfer Cart — 100 t Configuration
ParameterValue
Load range70–500 t
Deck sizeL 5,500 × W 2,400 × H <900 mm
Peak motor power25.6 kW
Steel wheel diameter700 mm
Travel speedsHigh: 30 m/min; low: 11 m/min
Battery optionsLead-acid, maintenance-free or lithium with grade-A cells

Features

  • Hand-control storage shelf
  • Lifting points
  • Multifunction display
  • Quick-change battery pack
  • Travel indicator lights
  • Access key
  • Power switch
  • Wired hand control
  • Visual, modular control system

Standard Features

  • Fold-down electrical cabinet for service access
  • High and low speed modes
  • Soft start, soft stop and stepless speed control
  • Automatic parking brake
  • Travel indicator lights
  • Audible travel warning
  • Access key
  • Wired hand control
  • 7-inch connected display
  • KPX-compatible charger

Options

  • Quick-change battery pack
  • Ride-on standing platform
  • Rail cleaning device
  • Towing or towable attachment
  • Lithium battery heating
  • Weighing system
  • Custom automation
  • Explosion-protected electrical equipment
  • Wireless remote control
  • Safety guardrails
  • Impact buffers
  • Infrared or laser safety sensing
  • Custom deck dimensions
  • Access steps
  • Onboard push-button controls
  • End-of-track derailment protection
  • Contact safety bumpers
  • Multi-station stopping
  • Custom turning functions

Applications

Fixed transport routes

Connect production, storage and service stations along a defined track.

Track and floor interfaces

Confirm rail gauge, rail level, foundation capacity and loading clearances together.

Controls

Use manual or remote control for basic transport. Choose an RGV where automatic station transfer is required.

Enquiry Details

Send the load, track layout, gauge, rail level, route length, stations and loading method.

FAQs

Can I use existing rails?

Check the gauge, rail condition, foundation capacity and rail level first.

Who supplies the track?

Track, civil works and installation are defined in the project scope.

How is an RGV different?

An RGV adds automatic tasks, station positioning and process interlocks.