Equipment scope
The sectional enclosure closes around the module casting station. Temperature monitoring and controls support the agreed heating, holding and cooling procedure. Mix trials and strength tests establish release timing.
- Enclosure sections and movement clearances
- Steam distribution and site connections
- Temperature sensing and cycle records
- Access for casting, inspection and stripping
Configuration inputs
- Module and mould envelope
- Concrete mix and release-strength requirements
- Station layout, utilities and planned cycle
Equipment limits, utilities, controls and acceptance requirements are confirmed in the project technical package.

