Equipment scope
The curing system coordinates chamber allocation, steam supply, temperature control and mould movement. Concrete mix trials and strength tests establish the curing procedure and release conditions.
- Chamber capacity and mould loading arrangements
- Steam distribution and utility connections
- Temperature sensing, control and cycle records
- Handover between spinning, curing and demoulding
Configuration inputs
Provide the pile families, mould quantities, production schedule, concrete mix and required release strength. Include the available steam supply, site utilities and chamber layout.
Heating, holding and cooling procedures, equipment limits and acceptance requirements are confirmed in the project technical package.
Related equipment
Steam curing control cabinet and steam boiler form separate parts of the agreed curing scope.