A drainage pipe carries water. A jacking pipe carries water and, during installation, the entire thrust of the jacking rig pressing a string of pipes through the ground. The second job is what makes its mould a different tool from a standard pipe mould, even when both produce a pipe of the same diameter.
That difference is decided at the mould order, not at the casting bed. End face geometry, joint formers, band seating and wall thickness tolerance all come out of the mould, and a pipe that is dimensionally fine for open trench work can be unusable behind a shield because the ends do not transmit load properly.
What makes a jacking pipe different
A pipe jacked through the ground is pushed from behind. The force passes from the jacking rams into the trailing pipe, from that pipe into the next one, and so on along the drive. Each pipe therefore has to carry an axial load through its ends, and the ends have to stay in contact while the string is steered around a curve or corrected back onto line.
The Pipe Jacking Association describes concrete jacking pipes as designed so that jacking forces are transmitted along the pipeline without damage to the joint, with lengths typically between 1.2 and 2.5 m and flexible joints complying with BS EN 1916 for watertightness at given draw and deflection limits. The joint therefore has to seal and carry load in the same few centimetres of concrete, and the mould decides whether that is possible.
A public utility specification for jacking work makes the requirement more explicit. The EPCOR construction specification requires the joint to be formed within the pipe wall thickness with no internal or external projections, to transfer longitudinal jacking loads including eccentric loads from line deviation without overstressing or spalling the joint faces, and to accept a full 360 degree packing ring at every joint. The same document requires bell and spigot mating surfaces to be perpendicular to the pipe axis within 6 mm.
The joint carries the force, not only the water
On a standard pipe the joint's job is to keep water in and soil out. On a jacking pipe it is also the load path, and that changes what has to be accurate.
Contact has to be full-face. If the end faces are not parallel, the thrust concentrates on one side of the annulus, and the concrete there crumbles. Packers are placed between pipes to spread that load, and the association's guidance is specific about them: packers should not extend over the full joint width, and a small gap should be left to the inside surface to prevent localised spalling. That gap is a mould dimension, because the rebate that locates the packer is formed by the mould's end detail.
Nothing may project beyond the wall thickness. Any collar, band or sealing element that stands proud of the outside diameter increases friction against the bore and can catch on the shield or on an obstruction. This is why jacking pipe joints tend to be flush or slightly recessed, and why the joint former has to sit inside the shell rather than outside it.
The joint also has to articulate. A drive is not a straight line, and the pipe string is steered. A joint that is stiff in rotation transfers the correction into the pipe body and cracks it, so the seal geometry has to allow a small rotation while staying watertight at the draw and deflection limits the standard sets.
Wall thickness is the load-carrying area
The axial load passes through the annular concrete section at the pipe end. Wall thickness is therefore not only a cover and strength question, it is the area that decides how much jacking force the pipe can take before the end face fails.
That puts a premium on concentricity. If the core sits off-centre in the shell, the wall is thin on one side, and the contact area available to transmit thrust drops exactly where the stress is highest. A pipe that measures correctly at the outside diameter and is eccentric inside will pass a dimensional check and fail on site.
Mould construction decides how well that is held. A rigid shell with a core that is guided on a machined spigot and located positively at both ends holds concentricity better than a core positioned by hand and clamped by friction. The same logic applies to ovality: out-of-round pipe reduces the contact band and increases the local pressure at the joint.
End squareness and length, which accumulate along a drive
Each pipe's end faces set the direction of the next one. If the faces are not square to the axis, every joint in the string introduces a small angular step, and the drive drifts or the pipe ends spall as the rams push against a partial contact area.
This is where the mould's end rings do most of the work. The end ring is the part that forms the pipe end face, and it is normally machined as a ring and fixed to the shell in a way that keeps it perpendicular. A ring that is welded in place and then machined in situ on the assembled mould holds squareness better than one machined separately and bolted to a distorted shell.
Length matters less for accumulation than for fit. Pipe lengths are consistent within a drive so that packers, interjack stations and shield connections match, and the buyer's specification normally states the tolerance on overall length as well as on the joint faces. A mould that produces pipes at the bottom of the length tolerance and another that produces them at the top will both pass individually and cause problems when mixed in one drive.
The steel band and the seat that holds it
Many jacking pipes carry a cast-in steel band or collar at the joint. The band protects the concrete edge during jacking, holds the joint alignment and, in some designs, provides the surface the packer bears on.
The band is set by the mould. It needs a seat that positions it concentrically and at the right distance from the end face, and it needs to be held there while the concrete is placed and compacted, because a band that floats inward during casting produces a pipe with a step at the joint. The specification quoted above allows metal bands where axial loading requires them, and leaves the detail to the manufacturer, which means the mould design carries the decision.
Stainless and coated bands are both used. The choice affects the seat dimension and the way the band is protected during casting and stripping, and it should be settled with the mould rather than with the pipe supplier's purchasing department after the mould is built.
Lead pipes and interjack pipes are not the same tool
A drive does not consist of identical pipes. The leading pipe connects to the shield or the tunnel boring machine and usually has a rebated or specially shaped end. The pipes either side of an intermediate jacking station have their own end details, because the station carries its own rams and pushes only the pipe ahead of it.
The association's guidance names these as separate products: rebated leading pipes for insertion into the jacking shield, and special rebated pipes for the trailing pipes at intermediate jacking stations.
For the buyer this is a mould count question. The options are change parts on the main mould, a separate smaller mould for the special ends, or a supplier who casts the specials on a different line. Each has a cost and a schedule consequence, and the decision belongs in the enquiry, because the number of lead and interjack pipes is known from the drive design at tender stage.
Demoulding a joint with a rebate in it
A rebated joint traps concrete. The rebate has an internal corner, the seal groove has another, and both resist being pulled off a core that has to travel axially.
Stripping depends on draft and on sequence. Every face that has to release needs enough taper, or a split, to break the suction. The core then comes out before the shell is lifted, or the shell splits before the core moves, depending on the design; the wrong order tears the joint edge.
This is also where a trial assembly earns its place. Joint formers, band seats and end rings can all be checked on the assembled mould before dispatch, and a first cast measured at the joint is a better acceptance test than a dimensional report on the steel alone, because it shows whether the assembly holds under placing and vibration.
What to put in the mould enquiry
| Item | What to send | Why the mould depends on it |
|---|---|---|
| Pipe schedule | Diameter, wall thickness, length and strength class | Sets the shell, core and end ring sizes |
| Standard basis | Whether the pipe is to BS EN 1916 and which joint type applies | Fixes joint geometry and test requirements |
| Joint detail | Rebate, collar or band, seal type and groove profile | Drives formers, draft and stripping sequence |
| Jacking data | Expected thrust, packer type and thickness | Confirms the end face area and the band requirement |
| Drive design | Number of lead and interjack pipes, and their end details | Decides change parts or separate moulds |
| Tolerances | Squareness, concentricity, length and ovality limits | Sets machining and assembly method |
| Production | Casting method, compaction, cure and stripping method | Determines core guidance and release provisions |
| Handling | Crane capacity and lifting points on the mould | Sizes the frame and the lifting provisions |
Where this fits Realjet's mould scope
Realjet builds project specific steel moulds for municipal and infrastructure components, designed around the component geometry, the casting method and the plant layout, with dimensional records agreed against the component drawing. The concrete pipe mould is the product family that covers this work, with inner core and outer shell configurations in conventional, mechanically assisted or station integrated arrangements.
The precast mould catalogue shows how pipe moulds sit alongside the drainage, chamber and road barrier families. Joint geometry, band seating and end ring tolerances are reviewed against the buyer's pipe drawing before manufacturing, and the number of special end moulds or change parts is settled in that review rather than after the order.