A machine fails, the spare is unavailable, and the only thing in the building that describes the part is the part itself. Sending it to a fabricator looks like the fastest route to a replacement. It usually is not, because a physical sample answers a different question from the one the supplier has to quote against.
A sample shows shape. It does not show the tolerance the part has to hold, the acceptance level its welds were built to, or the steel it was made from. Those three items decide most of the price and all of the inspection, and none of them can be read off a used component. This article sets out what a buyer has to put on paper before a part can move from sample to order, and where the responsibility sits when it does not happen.
What a sample actually proves
A sample establishes that the shape exists, that it once fitted, and roughly how the part was made. It also fixes the envelope and the hole positions as they are now. Useful for a drawing office, and still not a specification.
The distinction matters because a fabricator quoting from a sample has to guess at everything the sample cannot show, and a guess becomes either a price premium for the risk or a dispute after delivery.
Geometry is the easy half
Measuring a component is straightforward now. A portable measuring arm, a structured light scanner or a coordinate measuring machine will produce a point cloud and, with software, a solid model. The output looks like a drawing and is not one.
What measurement gives you is nominal geometry with the deviations of that particular part baked in. If the bore has worn 0.4 mm oversize, the model has a bore 0.4 mm oversize. If the flange has been sprung by welding, the model has the spring. Reproducing those features faithfully reproduces the fault.
The practical step is to measure, then decide which dimensions are nominal and which are the result of service. That decision belongs to whoever owns the function of the part, which is normally the buyer's engineering side and not the fabricator.
Why a measured value is not a tolerance
A measured value is not a tolerance. Knowing that a bore came out at 60.05 mm says nothing about whether 60.05 mm is acceptable, and the difference between an acceptable range of 0.02 mm and one of 0.2 mm changes the process, the machine and the price.
This is where a drawing does work that a model cannot. ISO 1101 defines the language for geometric tolerances: flatness, position, perpendicularity, concentricity expressed as a zone with a value and a datum. A model without that language is a shape, and a supplier quoting a shape has to assume a tolerance to price the machining.
The assumption normally lands on the cautious side. If the drawing is silent, the fabricator either applies a general tolerance that may be tighter than the part needs, or asks, and the enquiry stalls for a week while someone measures a worn seat and guesses.
Two habits avoid most of this. Put a tolerance on every feature that mates with something else, and put a general tolerance note on the drawing for everything that does not. Then state which datums the inspection will use, because a position tolerance without a datum reference is not checkable.
Welds carry requirements a sample hides
A weld on a sample shows that metal was joined. It does not show the leg length required, whether the joint is a full penetration butt or a fillet, whether it was examined, or what acceptance level applied.
Welding symbols exist to carry exactly that information. ISO 2553 defines the symbolic representation on drawings, including the joint type, the weld size, the length and the spacing of intermittent welds. Without symbols, the fabricator chooses a weld that looks like the sample, which may be a repair weld put in by a maintenance fitter ten years ago.
Acceptance is a separate layer again. ISO 5817 sets quality levels B, C and D for weld imperfections in steel, and the level determines how much porosity, undercut or misalignment is tolerated. A part built to level B and a part built to level D can look similar in a photograph and behave very differently in fatigue.
The cost of getting this wrong is asymmetric. Writing a weld class costs a sentence in the enquiry. Discovering after delivery that the critical joint was built as a visual-only fillet costs a rework, a schedule and an argument.
Steel grade travels as a document
Two plates of the same thickness, one S275 and one S355, look identical in a workshop. So do a normalized plate and a quenched and tempered one, until someone tries to weld or bend them.
Grade and condition therefore have to travel as documents, not as appearance. The usual evidence is a mill certificate to EN 10204 type 3.1, which ties the heat number to the mechanical properties, and a statement of the delivery condition. A sample part can be tested to establish its chemistry, and that test costs money and still does not tell you what the designer intended.
For anything that will be welded, the grade also drives the procedure. A welding procedure qualified on one material group does not automatically cover another at heavy thickness, so the grade has to be on the drawing before the fabricator starts writing the procedure. Buyers who are unsure what to ask for can start from the drawing and BOM readiness checklist used for made-to-drawing work.
Wear, repair and the wrong datum
Three specific problems show up again and again when a used part becomes the reference.
The first is copied wear. A bearing seat, a pin bore or a slide face that has worn becomes the new nominal, and the replacement part inherits a clearance that was never designed.
The second is the invisible repair. A cracked casting that was welded in the field, a boss that was built up and re-machined, a hole that was opened out to take a bigger fastener: all of these are now part of the geometry and none of them are in the original design intent. A fabricator working from the sample will reproduce the repair as if it were original.
The third is a datum taken from a worn or painted surface. If the model is aligned to the face that happened to be accessible, every other feature inherits that alignment error. Datums should come from the function of the part: the mounting face, the shaft centreline, the machined pad.
Who owns the drawing
In a made-to-drawing order the split is clean. The buyer supplies the drawing, the buyer owns the dimensions and tolerances on it, and the supplier owns the process, the sequence and the inspection evidence. Realjet works on that basis: welded frames, structures and equipment supports are manufactured to customer drawings, with machining of interfaces after fabrication.
Where only a sample exists, the split has to be created deliberately. Someone has to convert the sample into a drawing, and that someone has to accept responsibility for the dimensions. Three arrangements are common:
- The buyer's engineering team produces the drawing and issues it for quotation.
- The buyer engages a design office, and the drawing arrives with the buyer's approval stamp.
- The supplier produces a drawing for approval, and the buyer signs it before manufacture.
The third is workable and is not the same as a design service. Approving a drawing is a technical review, and the approval transfers the dimensional responsibility to the buyer at the moment of signature. Buyers who assume the fabricator has absorbed that risk are usually wrong, and the purchase order is where the assumption gets tested.
What to send with the enquiry
| Item | What to provide | Why the supplier needs it |
|---|---|---|
| Drawing | Fully dimensioned, toleranced, with datums and weld symbols | Prices the machining and the welding, and defines acceptance |
| Sample or scan | The part, or a scan with the alignment reported | Resolves geometry the drawing leaves unclear |
| Function notes | What the part does, which faces mate, what moves against what | Lets the supplier query a dimension that cannot be right |
| Material | Grade, delivery condition, certificate requirement | Sets the welding procedure and the material cost |
| Weld and NDT basis | Standard, acceptance level, examination coverage | Separates a visual check from ultrasonic testing in the price |
| Quantity and repeat | First order and expected annual volume | Decides whether tooling and fixtures are worth building |
| Inspection evidence | What records travel with the parts | Defines the first article and the dimensional report |
The sample is still worth sending. It shortens the drawing review and it settles arguments about a fillet radius faster than a model will. It just should not be the only thing in the parcel.
Where the cost moves
Converting a sample into a drawing changes the quotation in three places, and buyers should expect to see all three.
Machining allowance is the first. A drawing that specifies a machined interface at a tight tolerance on a welded assembly means the fabricator has to leave material, weld in a sequence that controls distortion, then machine after fabrication. Realjet's bending range of 3,200 to 6,000 mm and up to 500 t covers the forming side, and the machining scope covers drilling, boring, deburring and sub-assembly.
The second is the first article. A new part with a new drawing normally justifies a first article inspection, and the enquiry should say whether it is required. The first article inspection scope article sets out what to ask for.
The third is trial fit. Where a replacement part has to mate with something already installed, a trial assembly against a jig or against the mating component converts a dimensional risk into a known result before shipment.
Three requirements on paper
None of this is exotic. It is the ordinary work of turning a physical object into a requirement, and it is the difference between a quotation the supplier can stand behind and one padded to cover the unknown.
For a welded replacement part, the drawing carries the three things the sample cannot: the tolerance zone, the weld acceptance level and the steel grade. Get those onto paper and the rest of the enquiry is routine. The contract manufacturing service describes how a drawing set moves through review, fabrication and inspection, and the machined interface guide covers the features that most often need a tolerance decision before a quote is worth comparing.