One note, two dimensions

Most fabricated frames arrive with a drawing covered in small triangles and a note such as "6 mm fillet". That note is where orders go wrong more often than buyers expect, because the same number can describe two different welds.

An equal leg fillet weld has a leg length measured along each plate and an effective throat measured through the weld at 45 degrees. The throat is the leg multiplied by 0.707. A weld drawn as 6 mm leg has a throat of 4.2 mm. A weld specified as 6 mm throat has legs of 8.5 mm. For the same length, the first carries roughly 30 per cent less load than the second.

Both conventions are legitimate. The ISO system used across Europe and much of Asia dimensions the throat, while US practice dimensions the leg. ISO 2553 defines the symbols and where the size sits on them, and it is the reference a drawing should name when the designer and the shop work in different traditions.

The order should say which convention applies. One sentence removes a whole class of argument that otherwise surfaces after the frame is welded and measured.

What the symbol already fixes

A fillet symbol carries more than a size. ISO 2553 sets out how a drawing states the leg or throat, the length of the weld, whether it is continuous or intermittent and at what pitch, whether it runs all round a part, and whether the weld is made in the shop or on site.

Intermittent welds are the detail buyers most often leave open. The symbol fixes the relationship between welded length and pitch, and that relationship is what an inspector measures. A drawing that shows a size and a length but leaves the pitch to the shop has left a real decision open, because pitch changes both heat input and the amount of straightening that follows.

If the drawing is complete, the order only needs to reference it. If it is not, the gap gets filled on the shop floor, and shop floor decisions are the ones that are hardest to argue about later.

Why the codes put a floor under the size

Minimum fillet sizes exist for a thermal reason rather than a strength one. A small weld deposited on thick plate cools quickly, and fast cooling in a restrained joint is where hardness and cold cracking begin. The minimum is a way of guaranteeing enough heat input for the section being joined.

AISC 360 Table J2.4 sets minimum leg sizes by material thickness, from 1/8 in for parts up to 1/4 in thick to 5/16 in above 3/4 in. Current editions base the table on the thinner part joined. Older editions used the thicker part, which is worth knowing when a client specification was written a decade ago. The table is reproduced in this ASCE connection design handout.

EN 1993-1-8 takes a formula approach. The standard sets a minimum throat of 3 mm in clause 4.5.2, and national annexes add ductility rules such as a throat no smaller than the square root of the thicker plate thickness minus 0.5 mm. A set of advised throat thicknesses used in Eurocode teaching material runs from 3 mm for plate up to 10 mm, 4 mm from 11 to 20 mm, 5 mm from 21 to 30 mm and 6 mm above that. The course notes from VSB-TU Ostrava set the rules out alongside the resistance equations.

None of this changes the design. It changes what a shop is allowed to do when the drawing is silent, and it is the reason "6 mm everywhere" sometimes has to become 8 mm at the thick end of a bracket.

The maximum that protects the plate edge

There is a ceiling as well, and it has nothing to do with capacity. AISC 360 J2.2b limits the leg of a fillet weld along a plate edge to the plate thickness where the plate is thinner than 1/4 in, and to the thickness minus 1/16 in above that. The limit exists because a weld that runs past the edge melts it away.

The clause carries an escape. A drawing may require the edge to be built out to full throat thickness. That is a deliberate instruction, not a default, and the order should expect the shop to ask when a detail needs a weld as thick as the plate.

The maximum is a commercial item too. A weld one size too large along a thin flange edge either burns the corner or forces the shop to build it up and grind it back. Both outcomes cost more than the weld metal saved.

Short welds and long welds

EN 1993-1-8 sets a minimum effective length of six times the throat, and never less than 30 mm. A 20 mm tack with a 5 mm throat is not a structural weld, even when it is sound.

At the other end, a long longitudinal fillet does not carry load evenly. Once the weld exceeds 150 times its throat, the standard applies a reduction factor of 1.2 minus 0.2 times the length divided by 150 times the throat. A one metre run of 5 mm throat weld is well past that threshold, and the reduction is not small.

For a buyer this shows up as a detailing question. A stiffener that looks adequately welded on the drawing may need a longer weld or a different detail to develop the load the designer assumed. The answer belongs in the drawing review, not in a repair note after fabrication.

What a larger weld actually costs

Weld size is one of the few drawing decisions that moves cost in four directions at once. Filler metal consumption rises with the square of the leg for a given length. Arc time rises with it. Heat input rises too, which means more angular distortion in the frame and more straightening afterwards. And where the frame has machined interfaces, distortion that survives becomes machining allowance.

The welding distortion article covers the sequence side of that problem. On cost, an over-specified weld is not free margin. It shows up in consumables, in arc hours, and later in the straightening bench or the machining allowance.

A shop that under-welds tends to repeat the mistake along the whole frame, because the same interpretation was applied to every joint. That is why an undersized fillet is found at inspection when the part is complete, and why it costs more to correct than a weld that was one size too large.

What an inspector measures, and with what

ISO 5817 sets quality levels for imperfections in steel welds and is the reference most fabrication orders quote. The level chosen, B, C or D, decides how much undercut, porosity and convexity is accepted at the toe and face of a fillet.

Measurement is usually made with a fillet gauge, which checks each leg independently, or with a throat gauge that reads the perpendicular distance from root to face. The two do not always agree on a convex weld, because excess metal on the face adds nothing to the throat. One more reason to fix the convention before welding rather than after.

Where the joint is loaded in fatigue or the frame is safety related, the order will also set non-destructive testing scope. The welding procedure and NDT article covers how that scope is written and what evidence comes back with the parts.

Where the responsibility sits

The designer sizes the weld, states the convention and sets the quality level. That is a design decision and it cannot be delegated to the shop without a written instruction.

The fabricator owns the welding procedure, the qualification of that procedure and the welders, and the measured result. At Realjet the work runs under an ISO 3834-2 quality system with robotic arc and GMAW welding, and railway work is covered to EN 15085-2 CL1. Interfaces can be machined after fabrication, which is where weld-induced movement stops being a cosmetic issue.

The buyer owns the specification quoted in the purchase order, the inspection level and the evidence required. A contract manufacturing supplier that asks which edition of which standard applies is doing the right thing, and the answer should already be in the enquiry pack.

What to put in the enquiry

Item What to state Why it matters
Size convention Throat or leg, and the standard that defines it Two readings of one number differ by about 30 per cent
Minimum size The rule and its edition Older editions use the thicker part, newer the thinner
Edge maximum Whether any weld must be built out Affects plate preparation and grinding time
Quality level ISO 5817 level B, C or D Sets what inspection will accept
Length limits Minimum length and long joint treatment Decides whether a detail develops its load
Change control Who may change a size, and how it is recorded Stops improvisation on the shop floor
Evidence Procedure and welder records, dimensional report, NDT reports Makes the result auditable

Where to take the question

Weld size sits between the designer calculation and the shop procedure, and the weld joint preparation article covers the other half of the same joint, the groove and the root gap. Buyers comparing quotations for frames with machined interfaces will also find the execution class article useful, because the execution class decides how much weld documentation the order has to carry.

Settling the convention and the standard edition before release takes one line in the enquiry. Leaving them to the shop floor takes a measurement argument after delivery.