A kerb run is mostly straight, and the straight units are the easy part of the order. The money and the arguments sit in the curves: how many radii the network actually uses, whether the contractor is allowed to cut straights on site, and what happens at the point where a half battered profile meets a bullnosed one.

For a mould buyer, that means the radius set is a commercial decision before it is a technical one. Each radius is a separate curved form, and the number of forms is the number of cavities the plant will own for the next decade.

A radius unit is its own mould, not a bent one

A precast kerb unit is a straight prism with a curved plan. On a curve, the unit spans a chord rather than an arc, so the unit sits on the line at its two ends and deviates inwards at its middle. The deviation, measured at mid length, is the chord squared divided by eight times the radius.

Take a 914 mm unit on a 12 m radius: the deviation is about 8.7 mm. On a 6 m radius with the same unit it is about 17.4 mm. Those are not small numbers in a kerb line that a highway inspector will look along, which is why radius units exist: the curved form is machined so that the face follows the arc, and the joint faces are set to the angle that the radius demands.

A radius therefore cannot be produced by forcing a straight mould. The form has to be built for that radius, and the joint angle changes with it.

Where authorities draw the line

Two published specifications show how the rule is applied in practice, and they agree closely.

A Gloucestershire County Council materials policy states that the minimum radius achievable with standard length straight units is 12 m, that radius kerbs must be used below that, and that excessive trimming of straight units to reach tight radii is not permitted.

A Jersey government standard drawing for kerbs sets radius kerbs for all radii of 10 m or less, and 600 mm long straight units for radii between 10 m and 20 m. It also fixes a minimum cut length of 450 mm.

The same document adds a detail that matters to a mould supplier: the appropriate 914 mm transition kerb is to be installed at each change of kerb type, at tie ins to existing work, and at terminations. In other words, transitions are not an improvisation on site. They are ordered units with their own moulds.

Cutting is a fallback, and a constrained one

Both specifications allow cutting in some circumstances, and both limit it. Gloucestershire gives a 300 mm minimum for units cut from a 914 mm length, with a floor of one third of the original length and never below 50 mm. Jersey sets 450 mm.

Cutting produces a sawn face where the mould produced a cast one, and the sawn face is what the next unit butts against. A run made of cut units shows those faces at every joint. That is why the hierarchy in both documents is the same: radius units first, shorter straight units next for gentle curves, cutting only with permission.

For the mould order, the hierarchy translates into a question the buyer should answer before requesting a price: which radii appear in the work this plant expects to win, and which of them will be produced as radius units rather than cut?

The profile is shared, the radius is not

The value of a mould family is that the profile stays the same across the range. Batter, upstand, top width, arris radius, chase and any groove are fixed by the approved drawing, and the curved form changes to suit the radius. One set of profile tooling can therefore serve a series of radii if the design allows the curved element to be changed without rebuilding the whole mould.

EN 1340 is the product standard for concrete kerb units, and its scope is narrower than buyers often assume. It sets materials, properties and tolerances, and its own summary says it does not include requirements for cross sections, shapes and dimensions beyond tolerances. The profile itself comes from the highway authority or the designer. That is why a mould order needs the approved profile drawing, not a catalogue reference.

EN 1340 Annex C sets out how a single unit is measured: overall dimensions, draw and chase, straightness and bow, and facing layer thickness where there is one. Those are the dimensions a mould has to control, and they are the ones worth naming in the inspection record.

Transitions, drop kerbs and the ends of a run

A transition unit changes profile along its length: half battered at one end, bullnosed at the other, or one height stepping to another. It cannot be cast in a straight mould with a different end plate, because the change runs the whole length.

Drop kerbs at vehicle crossings and pedestrian crossings add a second family. The upstand at a crossing is a matter for the authority, and the mould has to produce the ramp and the level section as one unit, with the joint faces square to the run.

End units and quadrants complete the set. Quadrants form the corner where two runs meet, and their plan geometry is fixed by the two radii rather than by the profile.

Joint faces are where a curved run fails

On a straight run, a joint is a plane between two identical units. On a curve, each joint is at a slightly different angle, and a small error at the joint shows up as an open gap on the face the public sees.

The Jersey drawing asks for close jointed kerbs with joints of 2 to 4 mm, and mortar joints where minor open tapers occur between formed faces. A mould that holds its joint faces square and its length consistent gives the contractor a chance of meeting that. A mould with a worn or distorted end face does not, and no amount of site skill recovers it.

This is the argument for hardened end plates and for a locking arrangement that pulls the end faces into position every cycle rather than relying on clamps tightened by feel.

How many radius sets to buy

Every radius in the set is a capital item, and most plants do not need every radius. A workable approach is to fix the profile once, then buy curved forms for the radii that appear repeatedly in the local programme, and accept cut or shorter units for the occasional curve.

The question to put to the market is which radii the local authority actually specifies. Answers vary: one highway department publishes radius kerbs at 1, 3, 6 and 9 m, another works from a standard drawing with radius units from under a metre upward. Buying a set that does not match local practice leaves the plant cutting units it was told not to cut.

Where the profile is shared and the curved element is replaceable, the set can grow later. That option is worth more than a discount on a fixed set, because it moves the cost from a new mould to a new form.

Stripping, handling and the short unit problem

Short units strip easily but handle badly. They are light enough to be lifted by hand, which is exactly when arrises get damaged, and their small footprint on a pallet means more units per pallet and more chances of a chipped edge.

The mould detail that helps is a controlled opening: side forms that swing or slide clear rather than being levered off, and a base that lets the unit be lifted square. On a multi cavity arrangement the same logic applies per cavity, and the cleaning access matters as much as the casting access.

What to put in the enquiry

Input What to send Why the mould depends on it
Approved profile The authority's drawing with batter, upstand, arris and chase Defines the contact faces and the tooling
Radius list Each radius required, with expected annual quantity Sets how many curved forms are needed
Unit lengths Standard length and any shorter lengths for gentle curves Fixes the cavity length and the joint faces
Transition types Each change of profile in the programme Each is a separate mould or insert set
Drop kerbs Crossing layouts and upstand requirements Changes the end forms and the ramp face
Joint detail Target joint width and sealing method Drives end plate accuracy and hardness
Surface requirement Visible face finish and colour control Affects steel finish and release system
Output Units per day and shift pattern Decides cavities and opening method
Handling Lifting method and pallet type Shapes the base and lifting points

The rows that buyers most often leave out are the radius list and the joint detail. Both are cheap to answer at enquiry stage and expensive to discover after the moulds are built.

Where this fits Realjet's scope

Realjet builds steel moulds for precast concrete units around the approved component drawing, the casting method and the plant layout, with dimensional records agreed against that drawing. Road and kerb work sits within the municipal and infrastructure moulds range.

The road barrier and kerb moulds page sets out the configurations used for these profiles, including segmented single cavity moulds, multi cavity arrangements, and replaceable inserts where approved variants share a main profile. The RFQ inputs for a barrier or kerb mould cover the rest of the technical package, and profile selection deals with the case where the profile itself is still being chosen.