The purchase price is not the number that matters
The purchase price is only one input. Two suppliers can quote close totals and deliver very different cost per accepted unit, because the number of casts, the hours spent opening and cleaning the mould, the refurbishment needed along the way and the units rejected for face or dimensional reasons are not in the headline price.
A buyer who compares only the quotation total is working with one number out of four. Cost per accepted cast is a purchasing calculation, and it belongs in the same enquiry as the geometry and the mould drawing because it changes which design is worth paying for.
This is a question about a specific product family. The precast concrete mould range groups project steel moulds by component family, and the building component moulds category covers the slabs, panels, columns and stairs made in repeat production. The product this article discusses is the double tee slab mould, configured around an approved cross section, prestressing arrangement and casting bed layout.
Start from accepted units, not casts
The denominator should be accepted units that can be dispatched, not pours. A cast that is stripped late, has a poor flange face or fails a dimensional check is still a cast, but it does not earn its share of the mould cost. Define what counts as accepted before comparing offers: the face class, the dimensional tolerances, the strip strength and who makes the call.
ACI's formwork guide addresses the design and use of forms for concrete construction. A PCI sustainability notebook notes that wood forms are generally reused a few dozen times and that steel and glass reinforced forms have substantially longer service lives. Neither statement gives a life figure for a project mould. There is no useful universal number, because life depends on the casting sequence, the mix, stripping practice, handling and repair. A supplier who quotes a fixed life without asking about those inputs is making an assumption the buyer will pay for.
Write the calculation once, then fill it in per offer
A workable first-pass expression is:
| Term | Where it comes from |
|---|---|
| Mould purchase and delivery | Supplier quotation, including any transport |
| Refurbishment over the run | Face repair, replacement strips and re-machining assumptions |
| Stripping and cleaning labour | Buyer's method and measured or estimated hours per cast |
| Reject and rework cost | Buyer's quality record and the agreed face class |
| Expected accepted casts | Quantity programme divided into product runs |
Dividing the first four terms by the fifth gives a cost per accepted cast that can be compared between designs. The terms are deliberately not all supplier numbers. The labour, reject and programme figures belong to the buyer's plant, and a supplier cannot invent them. Putting them in the enquiry shows which offer deserves a closer look.
A segmental bridge case published in ASPIRE magazine makes the same point from another angle. On a small project with 62 segments, a simple form with fewer functions cost less to buy but roughly doubled the casting cycle to about two segments a week. The producer accepted the slower cycle because the form was cheaper and segments could be stocked before erection. The right answer depended on the programme, not on the form price alone.
What changes the number on a double tee mould
Double tee geometry concentrates cost in a few places. The flange face is wide and visible, so a face that marks or pits will drive rework. The ribs are deep and narrow, so stripping access and draft decide how hard the unit is to release. End forms and openings move between units when lengths or inserts vary, so their details decide how long a change takes.
Ask the supplier to state which casting face finish is included, how the face is supported against fresh concrete pressure, and what happens when the finish degrades. The slab casting face specification guide covers the finish question in more detail. For the ribs, the relevant points are draft, corner radii and the route the unit takes out of the mould.
Prestressing adds another interface. The mould and bed must suit the tensioning arrangement, and release timing controls when the mould is free for the next unit. The double tee mould layout guide explains how layout follows the approved geometry and production method. If the buyer's release rule is conservative, the mould count must absorb the longer occupied time.
Reuse assumptions belong in the order
Because there is no universal life figure, the number of casts has to come from the buyer's programme and the supplier's design response. State the total quantity, how it is split between runs, the face class required and the stripping method. Ask each supplier to describe which parts are expected to wear first and which are replaceable.
The wear parts guide lists the items that should be priced as spares rather than discovered later. Interchangeability matters here: a replaceable strip that needs fitting on site costs more than the strip. Ask for the interface detail, not just the spare part.
Refurbishment is the term most often left out of a comparison. A face that can be locally repaired keeps the mould in service. A face that needs full re-machining takes the mould out of the programme. The price drivers guide shows which design choices sit behind that difference. If a low quote assumes the buyer will accept a face that needs earlier work, the comparison has to include that work.
Who decides what
The buyer owns the component drawing, the accepted face class, the production programme and the reject rule. The designer of the mould owns the layout that achieves them, including stiffening, joint positions and stripping access. The supplier owns its fabrication method, subject to the agreed interfaces. Nothing in a cost per cast calculation transfers the designer's geometry to the supplier, and nothing in a supplier's life estimate transfers the buyer's quality decision.
A mould built to a drawing still needs proof. The mould drawing approval guide explains why geometry should be signed before manufacture, and the mould tolerances guide sets out what the cavity has to hold. A first unit measured against those documents is better evidence than a predicted cycle count.
Where this fits in the enquiry
Send the quantity by run, the approved section and reinforcement drawing, the prestressing arrangement, the face class, the stripping method and the buyer's process loss allowance. Ask for the mould price, the delivery, the replaceable parts list, the refurbishment assumption and the expected changeover time between variants.
Realjet builds project-specific steel moulds designed around component geometry, casting method and plant layout, with dimensional records agreed against the component drawing. A double tee mould on a precast production line is specified against that information. Comparing offers on cost per accepted cast keeps the enquiry focused on what the mould will actually deliver, not only on what it costs to buy.