A welded frame usually arrives at the assembly bay with a shopping list of things that must screw into it. Motor mounts, guards, cable trays, hydraulic plates and access panels all need a thread that will accept a fastener without a field drill. Those features are small on the drawing and expensive to get wrong. A hole that is 2 mm out of position can be opened up; a tapping that was cut before galvanizing may seize on the bolt the buyer planned to use. This guide covers what a made-to-drawing order has to say about threaded features, and which of those decisions belong to the buyer.
Start with the joint, not the hole
The first question is what the thread has to do. A clearance hole with a nut on the far side asks for position and diameter. A tapped hole asks for position, diameter, pitch, depth and a class of fit. A stud welded to a plate asks for a stud type, a welding procedure and a test. Those are different lines in an enquiry, and a supplier cannot price the third from a drawing that only shows the first.
Write the joint down before the hole. Say whether the fastener comes from the buyer or the fabricator, whether it passes through one plate or two, and whether the joint is permanent or opened for service. A plate that will be dismantled during maintenance needs a thread that survives repeated cycles; one that is closed for the life of the machine can use a simpler insert. If the buyer plans to fit a bought-in component with its own hole pattern, that pattern is design input and should travel with the order.
Weld studs, tapped holes and inserts solve different problems
A tapped hole is cut into the parent plate, so its strength depends on plate thickness and on how much thread engages. Thin sheet will not hold a useful thread, which is why a nut, a rivet nut or a welded boss is used instead. A weld stud puts the thread on a purpose-made fastener attached before coating. ISO 13918:2017 specifies the studs and ceramic ferrules used for arc stud welding, including dimensions, materials and mechanical properties. It was confirmed in 2025 and remains the current edition; a revision is under development, so the order should name the edition it expects rather than the standard number alone.
For the process itself, ISO 14555:2025 covers arc stud welding of metallic materials under static and fatigue loading. It sets requirements for welding knowledge, procedure specification and qualification, operator testing and production weld testing. The 2025 edition replaced the 2017 version. If a frame uses studs on a fatigue-loaded part, the purchase specification should say that the qualification and testing clauses apply, not just that studs are required.
On many frames a drilled and tapped boss, or a nut cage fitted during assembly, is easier to inspect and easier to replace. The choice should be made against plate thickness, access after coating and the number of times the joint will be opened. Realjet's verified scope is made-to-drawing welded frames and structures with machined interfaces, robotic arc and GMAW welding with post-weld cleaning, drilling, boring, deburring and sub-assembly under an ISO 3834-2 welding quality system. Stud welding and insert systems are not listed in that verified scope, so a buyer wanting either should have the process named and confirmed in the contract rather than assumed from a general welding capability.
A thread callout is more than a diameter
Metric threads are normally called up by nominal diameter and pitch. The tolerance class is the part that is often missing. ISO 965-1:2026 defines the tolerance system for general purpose metric threads, based on ISO 261 and the basic profile of ISO 68-1. The 2026 edition replaced the 2013 version. A drawing that says M12 without a class leaves the supplier to pick a working fit, which is fine for a loose cover plate and not fine for a thread that must accept a plated bolt at the far end of a stack.
Ask for the internal and external classes separately. A common pairing is an internal 6H thread with an external 6g bolt, but the right combination depends on the coating and the assembly condition. Where the frame will be hot dip galvanized, ISO 965-4:2025 gives limits for external threads undersized to class 6az before galvanizing so they mate with internal threads at position H or G afterwards. The standard applies to a defined size range, so check that the chosen diameter falls inside it. If the design uses a bolt of a size outside that range, the coating sequence and any chasing operation need a separate agreement.
Thread depth is the other frequent omission. A blind tapping needs a stated useful thread depth, a drill depth that allows for the tap lead, and a note on whether the bottom of the hole may break through. On a plate that will be machined after welding, the sequence matters: cut the thread after machining and after any heat treatment that could distort the plate, or protect it during those operations.
Position belongs to the datum scheme
Thread position is not useful without a reference. ISO 1101:2017 defines the symbol language for geometrical specification, including tolerances of form, orientation and location. Use it to say which face is the datum and which hole pattern is located from it. A note such as "holes located from datum A and datum B" tells a supplier how to set up the part, and gives an inspector a way to measure the result.
For a welded frame, the general tolerances also need a home. ISO 13920:2023 gives four classes for linear and angular dimensions and for shape and position of welded structures. It states that manufacturing documentation without individually indicated tolerances, or without an adequate reference to general tolerances, is incomplete. Choosing a class on the drawing is therefore part of the design decision. It is not something a fabricator should infer after the price is fixed.
A pattern that spans a weld needs care. Two plates may each be drilled correctly and then move when the seam is welded. If the joint crosses a bolt line, the buyer should call for the pattern to be drilled or checked after welding, or accept a larger positional tolerance and use slotted holes. The bolt-hole fit-up guide explains how clearance and weld shrinkage interact on long frames.
Coating order changes the fit
Coating is a thread decision even when the drawing says nothing about it. Paint builds thickness in a tapping, and powder coat can bridge the first few turns. Masking a tapped hole before a coating line adds an operation, but leaving it open may mean the assembly team has to chase every thread on site. The order should state whether threads are masked, plugged or chased after coating, and who performs that work.
The surface treatment and coating guide sets out how to specify preparation and film thickness, and the galvanizing guide covers the venting and clearance issues that arise on dipped fabrications. If the frame is galvanized, agree the thread class before the dip rather than after a rejected assembly. Where a stud is welded after coating, note that the coating at the stud foot will be disturbed and needs a documented touch-up method.
Who decides what
The buyer owns the joint function, the fastener specification where it must match bought-in parts, and the thread class if the fit is critical. The supplier owns the method of making the feature, the sequence of drilling, tapping and welding, and the tooling needed to hold position. Both share the datum scheme: the buyer states the functional requirement, and the supplier confirms that the proposed manufacturing set-up can meet it.
A supplier should also state what it will not do. If the shop has no stud welding qualification, it should say so at quotation rather than subcontract the process without approval. The subcontracting guide explains how to keep approval and records in the prime contractor's name. The inspection and test plan guide shows where a thread check can be made a hold point.
Evidence to ask for
For a threaded feature, evidence is mostly dimensional and procedural. Ask for the first article report to include thread position measured from the agreed datums, useful thread depth, and the result of a gauge check recorded with the gauge identity. For studs, ask for the welding procedure qualification, operator qualification where the standard requires it, and the production bend or torque test record. Photographs of a gauge passing are not a substitute for a recorded result.
If the part is galvanized, ask for the thread check after coating, not before. The machined interface guide covers the wider question of which surfaces are finished after welding and what records accompany them. A first article inspection that covers threads alongside machined faces is usually cheaper than two separate visits.
Put it in one schedule
For the enquiry, make a single schedule that lists every threaded feature by item number, type, diameter, pitch, class, depth, datum reference and coating condition. Add the fastener source, the assembly sequence and the evidence to be supplied. Send the same schedule with each 3D model or drawing set so that bidders price identical work.
Those lines are short, and they settle most of the questions that appear at assembly. Threaded features belong with the drawing package, welding basis and inspection plan rather than in a note at the end. To discuss a frame with threaded features against a finished assembly drawing, use the contract manufacturing enquiry page and include the schedule with your drawing set.